Guild of Gas Fitters Operatives 1
“Trace and Repair”
Stoichiometry
No Lead, no plastic pipework 400Cmelting, solder, threaded, compression, PE outside, Metal inside fire proof. No dissimilar metals in clippingor pipework. CV energy 1040btu/ft3 Copper, Steel, Trac Pipe No Lead, no plastic pipework. Metal inside fire proof. No dissimilar metals leading to electrolysis. Ducted CSA <0.01m2 no vent, High vented is 0.05m2 same as duct CSA,
Before the first T or branch, seperation min 25mm/50mm for over 35mmF, gas/electric supply 150mm apart. Temp bonding Clamp UD/DU, LR/RL, never both together. Meter, away from food storage, hazardous. Made from 1.5mtrs of 10mm2 with clamps, Prevents electrical shock facilitates electrical earth continuity, to be used across any metal pipework, removing meters or pipe sections.
Up to 35mm2, branch sizes, under sizing ID, U6 0.008m3 , U16, 0.025m3, 170kW. Boiler 24kW/9.71, 2.47m3 , fire 5.5kW/, pressures inlet 75mb-regulator-21, 19-23, pipework only no drop, working pressure 20mb, 1mb drop across pipework. Up to 35mm2, 15mm 6kW, 22mm 18kW, 28mm 30kW, 35mm 45kW. Gas pressure 19-23, Pipework only no drop, working pressure 20mb, 1mb drop across Pipework.
Distances Horizontal, Vertical distances, Closed to secure pipe. Wrapover clips only to secure the pipes to the surfaces, Correct Horizontal, Vertical distances.
Outside Pipe runs not in line with Flues, not in risers, fire stops, H Vents table.
Through walls Sleeving/sealed inside both ends, outside just sleeve, with fire proof mastic/silicone, intumescent EN1366-3 putty. Must be of the same material. Gas pipe sealed inside the property. Covered for corrosion protection. Accessible ECV. Outside Pipe runs not in line with Flues, not in risers, install fire stops, H Vents table.
From meter to the appliances isolation valve, gas isolation has a stop indicating it is closed as water has a 360deg rotating handle. Solder melting point is 400C. Fittings are threaded, Yorkshire, End Feed capillary, compression with olive glands. Yellow PE is used for outside by Transco buried. Copper, Brass, Steel, elbow range, couplers, crossover, end caps, bayonet, threaded pipe adapters,
Isolation valve, Restrictor not capped off, all visible, plastic capoff.
Not permitted on fixed flues, flueless cooker, tumble dryer for cleaning, host type AR!!
Sample Frame, Coupler-back nut repair no new fitting, Parallel/Tapered thread, Hemp, balance the U gauge when connected.
IGE/UP/1B, 4-minute test let-by funding a leak. LDF joints, 1mb max drop, MOP lockup controls, Test valve missing NG, remove handle after test,
Not to be done before tightness testing, 15mm 6kW, 22mm 18kW, 28mm 30kW, 35mm 45kW.
Meter PV U6/E6/G4 28mm, Metric 0.01m3, Imperial 0.355, 3 ˝ divisions, 5 x 0.071 cycles. >0.02 flame off. U6/G4 >28mm 0.01+1.5 x pipe IV, E6 >28mm 0.0036+1.5 x pipe IV. U16/G10 0.03+1.5 x pipe IV.G10 PV 0.05m3
Standing, Working, Burner Pressure, Losses, Gas Rate. Manometer zeroed,
Pipe cutters, 15/22mm, Blow torch, Heat Mat, Heat Gloves, Pipe cleaner, Flux, Plumbers Solder, PPE, Masonry SDS 30mm type 2 for 28mm sleeving, and SDS 25/32mm Max 4, parallel shaft bits and a pilot hole, small diameter bit. LDF, Manometer, Screwdrivers, Meter and compression fitting spanners, Mole grips, SDS 700W drill, Screws, Plugs and masonry drill bit, medium drill battery/mains, Portable work bench, Meter caps,